• Lot 9-C FPIP II - SEZ, Brgy. Sta. Anastacia, Sto. Tomas Batangas, PH

post-image

ORIGINAL DESIGN - ONE GATE

post-image

Analysis Result (Imbalance Flow)

Using 1 gate design, one can see that the melted resin flows on the other end filled at 1.385 sec.

The difference between the two filling time is 0.244 which is a considerable amount in terms of flow balancing.