• Lot 9-C FPIP II - SEZ, Brgy. Sta. Anastacia, Sto. Tomas Batangas, PH

post-image

CHANGED DESIGN - TWO GATES

post-image

Analysis Result (Imbalance Flow)

At 85% (1.429 sec) using the same virtual parameters yet changing the gate quantity from 1 to 2, both ends still have empty space to fill at 100% (1.682 sec) last filling area was filled respectively.